The Planning Control Tower is the primary dashboard where technical planners oversee the synchronization between commercial demand and physical capacity.

1. Real-Time Resource Overview

A high-density view of upcoming “Viaggi” (Trips) across the entire service network.
  • Loading Progress: Highlighting the percentage of reserved vs. empty slots for every train.
  • Priority Management: Identifying urgent bookings that require immediate asset assignment.

2. Resource Conflict Management

The orchestration layer automatically flags potential operational failures:
  • Overbooking Alerts: When the number of confirmed bookings exceeds the physical capacity of the allocated wagons.
  • Asset Delays: Identifying if the assigned wagons for a departure are currently delayed on an inbound trip, risking a turnaround failure.

3. Composition Finalization

The bridge to Execution.
  • Consist Validation: Before a train can be handed over to dispatch, the Control Tower ensures all units are technically compatible and all dangerous goods (RID) are correctly placed.